Design & Consulting
News, activities and updates from BILOCO.

What Makes a Useful M&E Project Case Study
A useful technical case study establishes what a contractor actually did, under which conditions and what can be verified. A clear scope, context, approach and documented outcome are more meaningful than a project gallery alo.
Read article →
What Is an M&E Shopdrawing and Why It Matters Before Construction
Shopdrawings turn design intent into coordinated installation information. Their value lies not in drawing volume but in resolving equipment positions, elevations, routes and clashes among building services.
Read article →
M&E Quotation Checklist: Information to Provide Before Requesting a Price
An M&E price is only comparable when bidders are pricing the same scope. Drawings, BOQ, specifications, site constraints and schedule assumptions establish a common basis and reduce disputes over omissions.
Read article →
Choosing an M&E Contractor for a Factory: What Owners Should Verify
Selecting a factory M&E contractor begins with matching actual capabilities to the technical scope, not comparing brochures or quotations alone. Owners should assess delivered work, coordination with other disciplines and res.
Read article →