News
News, activities and updates from BILOCO.

MobiFone ELV Project: Turning Verified Records Into a Useful Case Study
BILOCO has publicly listed an MobiFone low-voltage systems project among its references. The project provides a context for understanding how ELV cabling, equipment, power and supporting infrastructure fit together.
Read article →
Rack Rooms and Structured Cabling: ELV Handover Checklist
A rack room is the concentration point for network and ELV connections. Handover should cover topology, labelling, cable management, power supplies and the rack environment.
Read article →
CCTV and Access Control: Items to Confirm Before Device Installation
CCTV and access control should be defined around operational needs, not just a hardware list. Viewing zones, access permissions, storage policies and failure responses need agreement with the operator.
Read article →
After a Flood: 5 First Steps for Your Factory's Power
Floodwater has gone down but the power should stay off. Five first steps that protect people and equipment before you check each panel in detail.
Read article →
What ELV Systems Typically Include in an M&E Project
ELV covers several communications and control systems, each with different cabling, power and security requirements. The common label “low voltage” does not imply a single technical standard.
Read article →
Industrial Technical Piping: Managing Interfaces and Maintenance Access
Industrial utility piping must serve process functions while remaining accessible for operation. Supports, valves, removable sections and maintenance paths should be reviewed together.
Read article →