M&E contractor

M&E contractor

BILOCO is the design and construction unit of M&E for factories, workshops and civil – commercial works. The website content is organized so that customers can clearly check the service, scope of implementation, reference project and how to submit technical requirements.

M&E solutions according to construction needs

BILOCO implements work groups including electrical system, water supply and drainage, HVAC – ventilation, fire protection, solar power, ELV – light electricity and M&E. maintenance. Each request is considered from the site conditions, design documents, scope of work and actual acceptance requirements of the project.

How BILOCO works

  1. Receipt of request and input data.
  2. Investigate the site as needed.
  3. Review technical solutions, scope and interfaces between disciplines.
  4. Prepare quotation and implementation plan.
  5. Shopdrawing/BIM, procurement, construction, QA/QC and HSE.
  6. Testing & Commissioning, Acceptance, Handover and Maintenance.

Competencies shown by profile and actual work

The project priority website, site images, scope of work and data have been confirmed by BILOCO. The data on the size, progress, certificates or results are only published when there is a verifiable record.

Project Requirements

The client should submit the type of works, location, M&E items to be implemented, expected progress milestones and available records. The BILOCO team will discuss the appropriate scope again before making plans and quotations.

Frequently asked questions

BILOCO implements work groups including electrical system, water supply and drainage, HVAC – ventilation, fire protection, solar power, ELV – light electricity and M&E. maintenance. Each request is considered from the site conditions, design documents, scope of work and actual acceptance requirements of the project.

  1. Receipt of request and input data.
  2. Investigate the site as needed.
  3. Review technical solutions, scope and interfaces between disciplines.
  4. Prepare quotation and implementation plan.
  5. Shopdrawing/BIM, procurement, construction, QA/QC and HSE.
  6. Testing & Commissioning, Acceptance, Handover and Maintenance.

The project priority website, site images, scope of work and data have been confirmed by BILOCO. The data on the size, progress, certificates or results are only published when there is a verifiable record.

The client should submit the type of works, location, M&E items to be implemented, expected progress milestones and available records. The BILOCO team will discuss the appropriate scope again before making plans and quotations.

Call Quote